Skip to main content

MANUFACTURING

A real workshop, real process

The four stages below were photographed at our partner factory — where frames, panels and doors are made. We handle assembly, stock and installation crews in Vietnam.

Workshop footage, filmed on site

Inside the workshop: cutting, welding, stacking panels

Filmed at the partner factory, unstaged: steel is cut to drawing, the frame is welded, then panels are stacked and sealed before assembly.

7-second clip · filmed on site · unedited

Partner workshop — panel stacking
Cutting and welding

Cutting and welding

Q235 square tube is cut to drawing and welded into top and bottom frames and 160 × 160 mm corner posts.

Coating and curing

Coating and curing

Components hang on the coating line, are sprayed evenly and cured before assembly.

Corner assemblies

Corner assemblies

Corner assemblies are batch-machined, wrapped and palleted — one set per module.

Material and sub-assembly stock

Material and sub-assembly stock

Galvanised tube and panels are stocked by specification, covering the orders in production.

CERTIFICATION

Certificates and what they cover

Panels and container units are produced by our partner factory. The three documents below are originals, open to verify the certificate numbers.

  • CE VCP-12280

    Sandwich panel (EN 14509:2013)

    Valid 29 Dec 2025 – 28 Dec 2028

    PDF
  • TD38872401

    Container houses (EN 1090-1)

    Attestation of conformity

    PDF
  • HAPTX2606200388

    Rock-wool panel — fire class A2 (GB 8624-2012)

    Test report, 6 pages

    Hard copy

FROM WORKSHOP TO SITE

Four steps, one contact

  1. 01

    Confirm configuration and drawings

  2. 02

    Production at the partner factory

  3. 03

    Transport and assembly in Vietnam

  4. 04

    Handover and warranty per contract

Want to see the workshop before ordering?

Send a request and we will arrange a visit or a live video walkthrough.

Book a factory visit
ZaloGet a quote